What happens in a fire

  1. 01

    Standby

    The network is full of water at 7.2 bar. Every valve is supervised and the pump controller waits on AUTO.

  2. 02

    Fire starts

    Heat collects under the ceiling. The glass bulb in the nearest sprinkler warms toward its 68 °C rating.

  3. 03

    Bulb bursts

    Only that one head opens. Water hits the deflector and sprays the fire straight away.

  4. 04

    Alarm

    Pressure drops, the alarm valve clapper lifts, the gong rings and the flow switch signals the fire panel.

  5. 05

    Pump starts

    The pressure switch starts the fire pump. It brings the network back up and keeps the head discharging.

  6. 06

    Fire controlled

    One head controls the fire. The rest of the building stays dry.

SYS-01 · WET PIPE · LIGHT HAZARDNORMAL
PROTECTED AREAPUMP ROOMRISERPUMP CONTROLLERAUTOSUCTION · FROM TANKMOTORFIRE PUMPALARM VALVEGONG68 °C HEADSTORED MATERIAL
PRESSURE7.2bar
BULB30°C
PUMP0rpm
FLOW0L/min

Standby. The network is full of water at 7.2 bar. Every valve is supervised and the pump controller waits on AUTO.

Engineer inspecting a fire pump room
PUMP ACCEPTANCE · 0 / 100 / 150 % FLOW
About OYMAS · من نحن

Systems that work in a fire

OYMAS is an Egyptian fire protection contractor with three years of hands-on experience delivering complete firefighting networks, from design review to Civil Defense handover.

One team owns the job from the first drawing to the final pressure test, so you deal with one accountable contractor instead of a chain of suppliers.

From drawing to handover

Our services

خدماتنا
STAGE 01

Engineering & design reviewالتصميم والمراجعة الهندسية

Hydraulic calculations, shop drawings, MEP coordination and Civil Defense submittal packages.

STAGE 02

Certified material supplyتوريد خامات معتمدة

UL / FM listed pipes, valves, sprinklers, cabinets and fire pump sets from approved brands.

STAGE 03

Installationالتركيب والتنفيذ

Grooved, threaded, welded and flanged networks, risers, pump rooms and hydrant loops.

STAGE 04

Testing & commissioningالاختبار والتشغيل

Hydrostatic tests, flushing, alarm-valve trip tests and fire-pump acceptance runs.

STAGE 05

Civil Defense approvalاعتماد الحماية المدنية

Documentation, inspection attendance and follow-up until the system is licensed.

STAGE 06

Maintenance & serviceالصيانة الدورية

Periodic inspection per NFPA 25, repairs, upgrades and retrofits of existing systems.

Service details & maintenance plans
Our experience

Selected projects

مشروعاتنا
01
Egypt-Japan University of Science and Technology
الجامعة المصرية اليابانية للعلوم والتكنولوجيا
EDUCATIONNew Borg El Arab · Alexandria
02
Alexandria University Hospitals
مستشفيات جامعة الإسكندرية
HEALTHCAREAlexandria
03
Ayady 4040
أيادي 4040
HEALTHCAREHospital
04
Akhbar El Yom Publishing House
دار أخبار اليوم
MEDIACairo
All projects & sectors
Supply chain

Brands we install

العلامات التجارية
Have drawings or a BOQ?

Get a technical & commercial offer